Air treatment for the technical platform of a new clinic
Clinique Thiers, Bordeaux
The need
Creation of a technical platform for the new Clinique Thiers. The project involved constructing a new building and installing air treatment units in a confined technical room.
The solution
Study and sizing carried out with the design office to define the equipment to be installed while taking space constraints into account. Adapted configuration of air and hydraulic connections for each air treatment unit.
Equipment sizing
Communication between controllers and the supervision system