Air treatment for the technical platform of a new clinic

Salle blanche installation équipement traitement air
Clinique Thiers, Bordeaux

The need

Creation of a technical platform for the new Clinique Thiers. The project involved constructing a new building and installing air treatment units in a confined technical room.

The solution

Study and sizing carried out with the design office to define the equipment to be installed while taking space constraints into account. Adapted configuration of air and hydraulic connections for each air treatment unit.

Equipment sizing

Communication between controllers and the supervision system

Commissioning assistance

More references