Air treatment for the sterilization department

Lesparre Clinic
AHU
The Need
As part of the technical development works for the sterilization department of the Clinique de Lesparre, an air treatment solution had to be implemented to ensure controlled air renewal and air quality conditions adapted to the requirements of this type of healthcare environment.
The Solution
Design and implementation of an air handling unit dedicated to the sterilization department, ensuring air renewal, climatic treatment, and energy optimization of the installation.
Outdoor installation
Outdoor installation of the air handling unit to facilitate integration within the building’s technical infrastructure.
Energy recovery
Integration of an energy recovery module to improve the installation’s energy efficiency.
Equipment sizing
Study and sizing of the equipment to meet the air handling and climatic requirements of the sterilization department.
Commissioning of the installation
Support during commissioning, including verification of equipment operation and adjustment of installation parameters.