Air treatment for the Clinique de Gentilly

Nancy

The need

As part of the technical development works at the Gentilly Clinic in Nancy, an air treatment solution had to be implemented to ensure the air renewal and extraction required for the proper operation of the premises.

The solution

Design and implementation of two air treatment units, ensuring air extraction and treatment while meeting the site’s technical constraints.

Air extraction system

Implementation of an extraction system ensuring air renewal and removal of stale air.

Equipment sizing

Study and sizing of the equipment to meet the installation’s specific air handling requirements.

Commissioning of the installation

Support during commissioning, including verification of equipment operation and adjustment of operating parameters.

Adaptation to healthcare constraints

Solution designed to integrate with the clinic’s technical infrastructure while meeting the operational requirements of a healthcare facility.

Installed solutions

More references