Air treatment for the faculty of medicine.

Image A2i air treatment equipment
Nice

The need

Air treatment for the Faculty of Medicine in Nice. Management of CO₂ levels through a sensor regulating the fresh air renewal rate.

Installation of the equipment in technical rooms with access constraints.

The solution

Study and sizing carried out with the design office to define the equipment to be installed while taking space constraints into account. Adapted configuration of air and hydraulic connections for each air treatment unit.

Equipment sizing

Delivery of the units in 2 modules with on-site assembly

Communication between controllers and the supervision system

Commissioning assistance