Completion of the emergency department technical platform.
Polyclinique PBRD, Lormont
Vertical units
The need
Renovation of the technical platform and installation of air treatment units in a confined technical room.
Definition of a high-performance air treatment system aligned with the policy of the GBNA group.
The solution
Equipment sizing carried out with the design office to define the systems to be installed while taking space constraints into account. Adapted configuration of air and hydraulic connections for each air treatment unit. Installation of an energy recovery module.
Integration of energy recovery into the selected air treatment solution
Equipment sizing
Adapted configuration for complex installation conditions