Completion of the emergency department technical platform.

Installation secteur santé traitement air
Polyclinique PBRD, Lormont
Vertical units

The need

Renovation of the technical platform and installation of air treatment units in a confined technical room.

Definition of a high-performance air treatment system aligned with the policy of the GBNA group.

The solution

Equipment sizing carried out with the design office to define the systems to be installed while taking space constraints into account. Adapted configuration of air and hydraulic connections for each air treatment unit. Installation of an energy recovery module.

Integration of energy recovery into the selected air treatment solution

Equipment sizing

Adapted configuration for complex installation conditions

More references