Air treatment for a Clinic

Paris-Bercy Clinic
Vertical AHU
The Need
As part of the technical development works at the Paris-Bercy Clinic, an air treatment solution had to be implemented to ensure the air renewal and extraction required for the proper operation of the premises.
The Solution
Design and implementation of an air treatment unit ensuring, air extraction and treatment while adapting to the technical constraints of the site.
Outdoor installation
Outdoor installation of the air treatment unit to facilitate integration within the building’s technical infrastructure.
Air extraction system
Implementation of an extraction system ensuring air renewal and removal of stale air.
Equipment sizing
Study and sizing of the installation to meet the site’s specific air handling requirements.
Commissioning of the installation
Support during commissioning, including verification of equipment operation and adjustment of installation parameters.