
As part of the development of a Cytotoxic Reconstitution Unit (CRU) and of a Compounding Area à Villeneuve-la-Garenne, an air treatment solution had to be implemented to guarantee the sanitary and safety conditions required for handling sensitive products.
The installation also required the placement of an outdoor air treatment unit on a rooftop terrace, including the integration of an energy recovery system.
Design and implementation of an air treatment unit solution dedicated to a URC and a sterile compounding area, integrating an energy recovery system and ensuring the filtration, air renewal, and pressure control conditions required for these healthcare environments.