The requirement

Renovation of the technical platform and installation of air handling units in a confined technical room.

Identify a high-performance air handling system in line with GBNA group policy.

The solution

Equipment sizing with the design office to define the equipment to be installed, taking into account space constraints. Configuration of air and hydraulic connections for each air handling unit. Installation of an energy recovery unit.

    • Customized equipment
    • PLC communication with the supervision system
    • Commissioning assistance
  • Integration of an energy-saving recovery unit
  • Customized equipment for easy installation in small spaces