The requirement

Creation of a technical platform for the new Thiers clinic in Bordeaux. Construction of a new building and installation of air handling units in a cramped technical room.

The solution

Study and sizing with the design office to define the equipment to be installed in a new building under construction and to save on the customer’s budget. Configuration of air and hydraulic connections adapted to each air handling unit.

  • Equipment sizing
  • PLC communication with the supervision system
  • Commissioning assistance
  • Budget savings, as no work is required to install equipment