The requirement
Creation of a technical platform for the new Thiers clinic in Bordeaux. Construction of a new building and installation of air handling units in a cramped technical room.
The solution
Study and sizing with the design office to define the equipment to be installed in a new building under construction and to save on the customer’s budget. Configuration of air and hydraulic connections adapted to each air handling unit.
- Equipment sizing
- PLC communication with the supervision system
- Commissioning assistance
- Budget savings, as no work is required to install equipment